Progress Details of Model Zone:

Agency Name: Uttarakhand Peyjal Nigam FIU Name:  World Bank Project Unit Haldwani Scheme Name: HALDWANI TALLI
Zone Name: Haldwani Talli % of Household Having Metered Connection: 100.00 % of Household Paying Tariff Charge: 92.00
% of Water Loss (NRW): 5.00 Active GRM System: Yes/No: Yes Time Taken for Grivance Redressal: 24-48 Hrs.
% of HH using UWSP Water without RO: 75.00 Measured Residual Chlorine in Water: <0.02 PPM Consumer Satiscation Level (in %): 99.00
% of vulnerable Group/Population included in the Scheme: 100.00 Duration of Water Supply: 16x7 Water Pressure in Zone: 10-12 Mtr.
Arragement for Grey Water Management is Available: Yes Stagnant Water Found in Any Place: No No. of Soak Pit Constructed: 0
: